Skip to content

01Freight exception management

Freight doesn't lose money moving. It loses money waiting.

Dwell puts a clock on every load between tender and POD, flags the ones about to cross into detention, and tells your desk which phone call is worth making first.

Read-only integration · Live in 3 weeks · No TMS replacement

Watchlist · Live

14:07 CST
  • DW-40912CRIT
    MRDN · Joliet DC-402:41
  • DW-40887WATCH
    KLNE · Fontana XD01:58
  • DW-40903CLEAR
    ATLR · Savannah GP-200:36

DW-40912 crosses free time in 19 min — $75/hr accrues after.

Network · 6 of 91 carriers

  • MRDNMeridian Freight Systems1,240 power units
  • KLNEKline Logistics Group870 power units
  • ATLRAtlas Regional612 power units
  • BGSTBergstrom Transport455 power units
  • CRDVCordova Drayage318 power units
  • PKVLPike & Vale Carriers204 power units

02What the desk gets back

01

$1.42M

Detention billed back per 100k loads

Charges Dwell customers recovered because arrival and departure were timestamped, not remembered.

02

41 min

Median warning before a load goes critical

Time between the first exception signal and free time expiring.

03

6.2%

Of loads accrue detention

Across the network. The 6% is where the entire margin conversation lives.

04

18 sec

Carrier ping to exception on screen

P95, measured from webhook receipt to queue render.

† Dwell is a fictional company. These figures are written to demonstrate how operational proof should be presented, not measured from a real network.

03Anatomy of one load

Eighteen hours. Four of them are the invoice.

Load DW-40912, Joliet to Fontana. Your TMS is confident about the eleven hours in the middle. The three hours and forty minutes at the dock are the part nobody was watching — and the only part that changed what the load cost.

  1. Tender accepted

    0:30

    Rate confirmed, carrier assigned

  2. In transit

    11:00

    Everything your TMS already shows you

  3. Gate in

    0:40

    Arrival timestamped by geofence, not by phone call

  4. Free time

    2:00

    Contractual. Costs nothing — yet

  5. Detention

    3:40

    $75/hr, accruing, invisible to most desks until the invoice lands

  6. Unloaded · POD

    0:50

    Departure timestamped, ledger closed

Detention on this load alone

$275

3h 40m over free time × $75/hr

Dwell raised this load at 02:22 — nineteen minutes before free time expired. The desk called the facility, got a door, and the load left at 02:58.

Actual charge: $0 · Avoided: $275

† Illustrative load. Free-time terms and detention rates vary by contract, lane and facility.

04Four surfaces, one desk

Built for the person who has to do something about it.

Not a reporting layer you check on Fridays. A queue that is empty when there is nothing wrong, and ordered by money when there is.

Exception queue

5 open · sorted by exposure
Open exceptions ordered by financial exposure
LoadLaneDwellOverStatus
DW-40912MRDN · Joliet IL → Fontana CA02:41+00:41CRIT
DW-40887KLNE · Laredo TX → Memphis TN01:58—WATCH
DW-40901ATLR · Savannah GA → Charlotte NC01:12—WATCH
DW-40903BGST · Newark NJ → Allentown PA00:36—CLEAR
DW-40918CRDV · Tacoma WA → Boise ID00:14—CLEAR

Carrier scorecard

On-time, 30d
  • ATLR Atlas Regional96% +2
  • BGST Bergstrom Transport91% +1
  • KLNE Kline Logistics84% −3
  • MRDN Meridian Freight71% −9

Detention ledger

Billable, this week

$2,700.00

Backed by gate timestamps, not carrier claims

  • INV-2261 Meridian Freight$1,875.00DISPUTED
  • INV-2258 Kline Logistics$600.00APPROVED
  • INV-2254 Atlas Regional$225.00APPROVED

Facility intelligence

Median dwell, 90d
  • Joliet DC-4 · Consignee3:12
  • Fontana XD · Consignee2:04
  • Savannah GP-2 · Shipper1:21
  • Allentown NE-1 · Consignee0:47

05Implementation

Three weeks, and nobody has to learn a new TMS.

01

Read what you already have

Dwell connects read-only to your TMS, your carriers' ELD feeds and the facility appointment system. Nothing is migrated, nothing is replaced, and your dispatchers keep the screens they know.

Week 1 · 4 hrs of your team's time

02

Put a clock on every load

Each load inherits its contractual free time from the rate confirmation. Geofence arrival starts the clock. Dwell knows the difference between a load that is early, a load that is idle, and a load that is costing you $75 an hour.

Continuous · P95 18 sec to screen

03

Raise it while it still matters

Exceptions land in one queue, ordered by exposure, with the facility contact and the carrier's dispatch number already attached. Your desk works top to bottom. When the queue is empty, there is genuinely nothing to do.

Median 41 min of warning

06From the desk

“We always knew detention was costing us. What we couldn't do was name the load, the facility and the hour — so every conversation with a carrier was an argument about memory.”

RO

Renata Okafor

VP Operations · Halden Grocery Group †

Loads under watch
38,400 / yr
Detention billed back
$412,000
Facilities re-negotiated
9 of 62
Time to first exception
Day 4

† Halden Grocery Group is an invented customer. The quote and the figures were written for this demonstration.

07Next step

Bring one bad week of loads. We'll show you what it cost.

A 30-minute walkthrough against your own data. No slides, no sandbox with invented shipments — your lanes, your facilities, your free-time terms.

Request a walkthrough
Format
30 min, screen share
Prep needed
One CSV of loads
Sales pressure
None